Willamette Basin Review Feasibility Study: Final Draft Integrated Feasibility Report and Environmental Assessment
Author | : United States. Army. Corps of Engineers. Portland District |
Publisher | : |
Total Pages | : |
Release | : 2019 |
ISBN-10 | : OCLC:1120985067 |
ISBN-13 | : |
Rating | : 4/5 (67 Downloads) |
Book excerpt: ““The feasibility study was re-initiated in 2015 with the goal of reallocating WVP conservation storage for the benefit of ESA-listed fish (F&W), agricultural irrigation (AI), and municipal and industrial (M&I) water supply, while continuing to fulfill other project purposes. The study documented in this integrated Feasibility Report and Environmental Assessment analyzes current water uses in the basin for F&W, M&I, and AI, provides projections of water needs for these three project purposes, and develops a combined conservation storage reallocation and water management plan that would provide the most public benefit within the policies and regulations of the Corps and the state of Oregon. The non-federal sponsor for the feasibility study is the Oregon Water Resources Department (OWRD).” From the Executive Summary, page i.